Automation of Ventilation of Flexible offices at ACK Bishops House, Nairobi. March, 2022

The project entailed the installation of Air Quality Sensors and Presence Detectors in 2 boardrooms, and Air Quality sensor in the Kitchen. The sensors were wired to an automated fan control panel that controls the ventilation system, ensuring that the rooms have fresh air as required, when there are people in the rooms.

Automation of Basement Car Park Ventilation at Kenafric Business Park, Ruaraka. September, 2022

This project scope involved the Supply, Installation, Testing and Commissioning of Automatic Control panel for the ventilation of basement car park. The basement was fitted with Carbon Monoxide (CO) sensors, whose signal levels were used to control the fresh air supply fan, the extract fans and the jet fans so as to ensure proper ventilation of the basement, thus avoiding carbon monoxide poisoning.

Power factor correction bank for Hewa Tele Ltd. August, 2022

This project scope was that of Supply, Installation and Commissioning of 80kVAR Automatic Power Factor Correction Bank

Negative Pressure in Isolation Rooms at AIC Kijabe Mission Hospital. July 2022

This project entailed the Supply, Installation and Commissioning of differential pressure sensors, modulating damper actuators and an automatic control panel to ensure that pressure of negative 20Pa is maintained in 4 Isolation rooms